PIP STS02465

$96.00

Augered Cast-in-Place Piles Installation Specification [Complete Revision]
standard by Process Industry Practices, 04/01/2019

PDF FormatPDF FormatMulti-User-AccessMulti-User AccessPrintablePrintableOnline downloadOnline Download
Category:

Description

This Practice describes requirements for furnishing and installing augered cast-in-place (ACIP) piles also called continuous flight auger (CFA) piles. Test piles, pile load tests and pile integrity testing are included and shall be executed in accordance with this specification when required.

Product Details

Published:
04/01/2019
Number of Pages:
26
File Size:
1 file , 360 KB
Note:
This product is unavailable in Ukraine, Russia, Belarus