NBBI NB23-2019 Part 3
Original price was: $150.00.$90.00Current price is: $90.00.
National Board Inspection Code – NBIC, 2019 Edition – Part 3 – Repairs and Alterations
standard by National Board of Boiler and Pressure Vessel Inspectors, 2019
The NBIC recognizes three important areas of post-construction activities where information, understanding,and following specific requirements will promote public and personal safety. These areas include:
- Installation
- Inspection
- Repairs and Alterations
The NBIC provides rules, information, and guidance for post-construction activities, but does not providedetails for all conditions involving pressure-retaining items. Where complete details are not provided in thiscode, the code user is advised to seek guidance from the Jurisdiction and from other technical sources.
The words shall, should, and may are used throughout the NBIC and have the following intent:
- Shall – action that is mandatory and required.
- Should – indicates a preferred but not mandatory means to accomplish the requirement unless specifiedby others such as the Jurisdiction.
- May – permissive, not required or a means to accomplish the specified task.
Product Details
- Published:
- 2019
- ANSI:
- ANSI Approved
- Number of Pages:
- 310
- File Size:
- 1 file , 7.1 MB
- Redline File Size:
- 2 files , 22 MB
- Note:
- This product is unavailable in Russia, Ukraine, Belarus