SSPC QP 7

$20.00

Procedure for Evaluating Painting Contractors with Limited Industrial Work Experience (Qualification Procedure No. 7)

Published by Publication Date Number of Pages
SSPC 04/09/2014 3
PDF FormatPDF FormatMulti-User-AccessMulti-User AccessPrintablePrintableOnline downloadOnline Download
Category:

Description

SSPC QP 7 – Procedure for Evaluating Painting Contractors with Limited Industrial Work Experience (Qualification Procedure No. 7)

This procedure establishes criteria for preliminary qualification of contractors who intend to apply for certification to an industrial or architectural/commercial coating contractor certification program but have less than 12 months experience (or no experience) in field application of industrial or architectural/commercial protective coatings. This procedure does not address preliminary qualification of contractors whose coating operations are conducted exclusively at a contractor’s fixed facility (i.e., shop painting).

Product Details

Published:
04/09/2014
Number of Pages:
3
File Size:
1 file , 130 KB
Note:
This product is unavailable in Ukraine, Belarus, Russia